Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/21/2002 PERMIT SUB-TYPE: SNEW PERMIT NO: B02-1950
JOB ADDRESS:
11656 CREEKWOOD DR
, TX 75035
DESC:   1879 AC, 2554 SQ FT, SFR / 1 STORY
OWNER:
PULTE HOMES
1431 GREENWAY DR.,SUITE 700
IRVING TX 75038

CONTRACTOR:
PULTE HOMES
1431 GREENWAY DR.,SUITE 700
IRVING TX 75038
ISSUED DATE:
7/25/2002
APPLIED DATE:
7/5/2002
EXPIRED DATE:
1/21/2003
SITE APN:
C2512416
STATUS:
COMPLETED
APPLICANT:
PULTE HOMES
1431 GREENWAY DR.,SUITE 700
IRVING TX 75038
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
140192.19
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING TOP OUT 9/16/2002 T$30.00
PLUMBING FEE$188.00
RESIDENTIAL ELECTRIC FEE$76.62
CAMERA 08/21/2002 NJ$30.00
BUILDING PERMIT FEE$1,198.75
CO 11/22/2002 CW$30.00
FENCE FEE$20.00
GAS/ELECTRIC 10/25/2002 TG$30.00
GAS/ELECTRIC 10/29/2002 TG$30.00
LAWNSPRINKLERSYSTEM$35.00
MECHANICAL FEE$96.50
Total Fees:$1,764.87
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  CAMERA
______  T-POLE
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING ROUGH-IN
______  2NDS
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  GAS/ELECTRIC
______  GAS/ELECTRIC
______  GAS/ELECTRIC
______  UTILITY / ROW
______  CO
______  CO
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)