|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/6/2002
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B02-1882
|
JOB ADDRESS: 4268 LEGACY DR FRISCO, TX 75034 |
DESC:
62801 SQ FT CNEW / ALBERTSONS GROCERY STORE #4219 |
|
OWNER:
ALBERTSONS
250 PARKCENTER BLVD BOISE ID 83726
|
CONTRACTOR:
CALLAWAY ARCHITECTS
17770 PRESTON RD DALLAS TX 75252
|
ISSUED DATE: 10/3/2002
APPLIED DATE:7/1/2002
EXPIRED DATE:4/1/2003
SITE APN:C2122591
STATUS:COMPLETED
|
|
APPLICANT:
CALLAWAY ARCHITECTS
17770 PRESTON RD DALLAS TX 75252
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 3000000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
MISCELLANEOUS ELECTRICAL FEES | $2,580.04 |
MISCELLANOUS MECHANICAL FEES | $607.70 |
MISCELLANEOUS PLUMBING FEES | $1,135.00 |
PLUMBING FINAL 6/30/2003 KSH | $35.00 |
COMMERCIAL BUILDING PERMIT FEE | $7,147.14 |
GREASE TRAP 12/27/2002 TP | $35.00 |
FRAME 3/20/2003 JB | $35.00 |
Total Fees: | $11,574.88 |
|
|
| ______ PIER |
______ PIER |
______ T-POLE |
______ SLAB |
______ SLAB |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ WATER |
______ ELECTRICAL ROUGH IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ WATER |
______ GREASE TRAP |
______ SLAB |
______ SLAB |
______ T-POLE |
______ SLAB |
______ ELECTRICAL ROUGH IN |
______ FRAME |
______ T-POLE |
______ MECHANICAL |
______ FRAME |
______ DRY WALL |
______ SLAB |
______ PAVING |
______ ELECTRICAL ROUGH IN |
______ CEILING |
______ PLUMBING TOP OUT |
______ MECHANICAL |
______ PLUMBING ROUGH-IN |
______ FRAME |
______ CEILING |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ FRAME |
______ FRAME |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL |
______ ELECTRICAL ROUGH IN |
______ ROOF DRAINS |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ HEALTH FINAL |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ HEALTH FINAL |
______ BUILDING FINAL |
______ MECHANICAL FINAL |
______ COURTESY HEALTH INSP |
______ BUILDING FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|