|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/7/2003
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B02-1881
|
JOB ADDRESS: 2811 INTERNET BLVD FRISCO, TX |
DESC:
119,070 SQ FT CNEW / HALL OFFICE PARK / BLDG G3 |
|
OWNER:
Hall Financial Group
2595 Dallas Parkway, Suite 300 Frisco TX 75034
|
CONTRACTOR:
AUSTIN COMMERCIAL
3535 TRAVIS ST DALLAS TX 75204
|
ISSUED DATE: 7/24/2002
APPLIED DATE:3/28/2003
EXPIRED DATE:1/20/2003
SITE APN:C2137128
STATUS:COMPLETED
|
|
APPLICANT:
AUSTIN COMMERCIAL
3535 TRAVIS ST DALLAS TX 75204
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 7000000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BUILDING PERMIT FEE | $0.00 |
MISCELLANEOUS BUILDING PERMIT | $400.00 |
MISCELLANEOUS ELECTRICAL FEES | $4,776.00 |
MISCELLANEOUS ELECTRICAL FEES | $20.00 |
MISCELLANOUS MECHANICAL FEES | $699.85 |
MISCELLANEOUS PLUMBING FEES | $938.00 |
PLUMBING TOP OUT 3/6/2003 PB | $35.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
Total Fees: | $6,903.85 |
|
|
| ______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ SLAB |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ SLAB |
______ ELECTRICAL ROUGH IN |
______ PAVING |
______ PIER |
______ PAVING |
______ PAVING |
______ PAVING |
______ PAVING |
______ PAVING |
______ PAVING |
______ PAVING |
______ PAVING |
______ SLAB |
______ SLAB |
______ D-STEEL |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ FRAME |
______ FLATWORK |
______ FRAME |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ MECHANICAL |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ ELECTRICAL |
______ MECHANICAL |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ CEILING |
______ CEILING |
______ ELECTRICAL ROUGH IN |
______ CEILING |
______ PLUMBING TOP OUT |
______ CEILING |
______ MECHANICAL |
______ PLUMBING FINAL |
______ CEILING |
______ PLUMBING FINAL |
______ MECHANICAL |
______ MECHANICAL |
______ MECHANICAL |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|