Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/7/2001 PERMIT SUB-TYPE: SNEW PERMIT NO: B01-1017
JOB ADDRESS:
9435 PENDLETON CT
FRISCO, TX
DESC:   2649 AC, 3213 SQ FT, SFR / 2 STORY
OWNER:
ASHTON DALLAS RESIDENTIAL
15851 Dallas Parkway #100
Addison TX 75001

CONTRACTOR:
ASHTON DALLAS RESIDENTIAL
15851 Dallas Parkway #100
Addison TX 75001
ISSUED DATE:
5/11/2001
APPLIED DATE:
5/7/2001
EXPIRED DATE:
SITE APN:
D218210
STATUS:
COMPLETED
APPLICANT:
ASHTON DALLAS RESIDENTIAL
15851 Dallas Parkway #100
Addison TX 75001
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
137218.2
FEE SUMMARY
INSPECTION SUMMARY
INSULATION TW$30.00
GAS/ELECTRIC 1/17/2002 MC$30.00
MECHANICAL FEE$116.50
PLUMBING FEE$218.00
RESIDENTIAL ELECTRIC FEE$96.39
2NDS TW$30.00
2NDS TW$30.00
2NDS 10/17/2001 MC$30.00
BUILDING PERMIT FEE$1,183.75
FENCE FEE$20.00
GAS/ELECTRIC 1/15/2002 MC$30.00
LAWNSPRINKLERSYSTEM$35.00
GAS/ELECTRIC 1/22/2002 MC$30.00
Total Fees:$1,879.64
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  FLATWORK
______  T-POLE
______  SLAB
______  CAMERA
______  T-POLE
______  PLUMBING TOP OUT
______  2NDS
______  2NDS
______  2NDS
______  2NDS
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  GAS/ELECTRIC
______  GAS/ELECTRIC
______  GAS/ELECTRIC
______  GAS/ELECTRIC
______  GAS/ELECTRIC
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)