BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/3/2000
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B00-2910
|
JOB ADDRESS: 5601 WARREN PKWY FRISCO, TX |
DESC:
CNEW / FRISCO SPECIALTY HOSPITAL |
|
OWNER:
UNITED SURGICAL PARTNERS
6602 COUNTRY LANE, #200 RICHMOND TX 77469
|
CONTRACTOR:
ROWLAND COMPANIES
3420 E. SHEA BLVD.,SUITE 170 85028
|
ISSUED DATE: 11/3/2000
APPLIED DATE:10/24/2000
EXPIRED DATE:5/2/2001
SITE APN:C2632288
STATUS:COMPLETED
|
|
APPLICANT:
POLKINGHORN GROUP ARCHITECTS
248 ADDIE ROY RD,SUITE B-301 AUSTIN TX 78746
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 5925700
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
COMMERCIAL ELECTRIC FEE | $2,200.00 |
COMMERCIAL BUILDING PERMIT FEE | $11,984.00 |
COMMERCIAL RED TAG FEE | $35.00 |
MISCELLANOUS MECHANICAL FEES | $1,368.40 |
MISCELLANEOUS PLUMBING FEES | $1,334.00 |
ELECTRICAL ROUGH IN 5/10/2002 | $35.00 |
2NDS 5/29/2002 JB | $35.00 |
CEILING 5/29/2002 JB | $35.00 |
CEILING 7/12/2002 JB | $35.00 |
CEILING 7/3/2002 JB | $35.00 |
ELECTRICAL ROUGH IN 5/16/2002 | $35.00 |
MECHANICAL 6/11/2002 JB | $35.00 |
PLUMBING FINAL BA | $35.00 |
Total Fees: | $17,201.40 |
|
|
| ______ PIER |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SEWER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PAVING |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SEWER |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FRAME |
______ |
______ 2ND FLOOR SANITARY R |
______ FRAME |
______ WATER |
______ FRAME |
______ ELECTRICAL ROUGH IN |
______ FRAME |
______ PLUMBING TOP OUT |
______ FRAME |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ PAVING |
______ MECHANICAL |
______ FRAME |
______ ELECTRICAL ROUGH IN |
______ FRAME |
______ ELECTRICAL ROUGH IN |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ DRY WALL |
______ ELECTRICAL ROUGH IN |
______ GAS PRESSURE |
______ ELECTRICAL ROUGH IN |
______ GAS AIR TEST |
______ DRY WALL |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ FRAME |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ CEILING |
______ 2NDS |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL RELEASE |
______ ELECTRICAL RELEASE |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ CEILING |
______ CEILING |
______ CEILING |
______ CEILING |
______ CEILING |
______ CEILING |
______ GAS RELEASE |
______ CEILING |
______ CEILING |
______ CEILING |
______ CEILING |
______ GAS RELEASE |
______ CEILING |
______ CEILING |
______ CEILING |
______ MECHANICAL |
______ CEILING |
______ CEILING |
______ CEILING |
______ CEILING |
______ CEILING |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ MECHANICAL |
______ MECHANICAL |
______ MECHANICAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ HEALTH INSPECTION |
______ CEILING |
______ CEILING |
______ HEALTH INSPECTION |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|