Notes:
OSSF SYSTEM INSTALL
5/8/2014 12:00:00 AM
01. ALL SUBJECT TO FIELD INSPECTIONS AND TESTING.
02. BELOW GRADE WASTE TIE-INS, SOLVENT JOINT OR "MISSION" TYPE S.S. BANDS.
03. BELOW GRADE PIPING TO BE BEDDED WITH SAND.
04. TRENCHES TO BE COPACTED AT BACKFILL.
601. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.