Notes:
2/10/2019 12:26:44 PM
*****A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL OF ANY R.O.W. OR EASEMENT HELD BY THE CITY SHALL FIRST OBTAIN A PERMIT FROM THE PUBLIC WORKS R.O.W. MANAGER AND CITY UTILITY LINE LOCATES. 11300 RESEARCH ROAD (972)292-5800
A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL TO A DEPTH OF 16 OR MORE INCHES SHALL NOTIFY A TEXAS ONE CALL NOTIFICATION CENTER NOT EARLIER THAN THE 14TH DAY BEFORE THE DATE THE EXCAVATION IS TO BEGIN OR LATER THAN THE 48TH HOUR BEFORE THE TIME THE EXCAVATION IS TO BEGIN IN ACCORDANCE WITH STATE LAW (DIAL 811)
*****BUILDING INSPECTIONS PERFORMS CONTINUOUS OBSERVATION OF ALL SCREENING WALL CONSTRUCTION. PLEASE CONTACT MAURICIO AGUILAR (469) 714-9708 MAGUILAR@FRISCOTEXAS.GOV WITH BUILDING INSPECTIONS PRIOR TO CONSTRUCTION MOBILIZATION TO COORDINATE WITH CITY STAFF FOR TIMELY OBSERVATIONS.****
3 FT IN HEIGHT RETAINING WALL LOCATIONS AS SPECIFIED ON SITE PLAN AND REFERENCE APPROVED PLANS.
SHALL NOT BE LOCATED WITH ANY DEDICATED EASEMENTS.
LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
***ENGINEERS DESIGN WILL NOT SUPPORT SURCHARGE LOADS OF BUILDINGS.
***GRADING SHALL COMPLY WITH ALL DETAILS OF CIVIL DESIGN DRAWINGS.
***DRAINAGE MATERIAL SHALL BE FREE OF FOREIGN DEBRIS.
***MEANS FOR RELIEF OF HYDROSTATIC PRESSURES ON WALL (DRAINAGE) REQUIRED FOR ALL WALLS IN EXCESS OF 2 FEET.