Permit Info
Short Description:
638025 SF, THE FRISCO DISTRICT BLDG __THE BECKETT
Expiration Date:
5/12/2027
Notes:
9/23/2026 10:13:53 AM
W. MULTIFAM/RESTAURANT
Parcel Info
City/State/Zip:
FRISCO, TX, 75034
Subdivision:
PROJECT FTX ADDITION (CFR)
|
| APPLICANT | SARAH ALLI | (240)645-1157 | salli@tortigallas.com | 1923 VERMONT AVE | WASHINGTON DC, 20001 |
| OWNER | WP DEVELOPMENT PARTNERS LLC | ()- | | | NEW YORK, NY 10153-0023 |
| CONTRACTOR | SLRTX Project X Construction, LLC | (940)765-3097 | jpeters@streetlightsres.com | 2300 N. Field Street | Dallas, TX 75201 |
| ELECT. CTR. | R & L ELECTRIC INC | (817)613-0819 | HR@rlelectricinc.com | 2318 FORT WORTH HWY | WEATHERFORD, TX 76087 |
| MECH. CTR. | TD INDUSTRIES (MECH) | (972)888-9500 | TDMechanical@tdindustries.com | 13850 DIPLOMAT DRIVE | DALLAS, TX 75234 |
| PLUM. CTR. | POWER PLUMBING INC | (903)326-8372 | billy.perry@powerlp.com | 1708 NW MCKINNEY ST | RICE, TX 75155 |
| OTHER | NORTH TEXAS CONTRACTING (PLUMB) | (817)430-9500 | paul@ntexcon.com | 4999 KELLER HASLET RD | KELLER, TX 76244 |
| OTHER1 | SENTELLE ENTERPRISES INC. | (972)291-3343 | sentelle@mac.com | 8628 STARGAZER DR | MCKINNEY, TX 75070 |
|
| PERCENT CREDIT CARD FEE |
$2.00
|
10/15/2025
|
| PERCENT CREDIT CARD FEE |
$1.00
|
11/13/2025
|
| PERCENT CREDIT CARD FEE |
$1.50
|
12/3/2025
|
| PERCENT CREDIT CARD FEE |
$1.50
|
7/17/2026
|
| PERCENT CREDIT CARD FEE |
$1.50
|
7/27/2026
|
| PERCENT CREDIT CARD FEE |
$1.50
|
10/23/2026
|
| PERCENT CREDIT CARD FEE |
$2.00
|
10/29/2026
|
| PERCENT CREDIT CARD FEE |
$1.50
|
11/9/2026
|
| PERCENT CREDIT CARD FEE |
$2.00
|
11/12/2026
|
| COMM BUILDING PERMIT FEE |
$100.00
|
10/15/2025
|
| COMM BUILDING PERMIT FEE |
$50.00
|
11/13/2025
|
| PLUMBING ROUGH-IN 07/16/2026 JWR |
$75.00
|
7/17/2026
|
| PLUMB TOP OUT COMM 07/21/2026 JWR |
$75.00
|
7/27/2026
|
| AUTO PROCESSING FEE |
$6.00
|
10/31/2022
|
| COMMERCIAL FEE |
$25,551.00
|
4/14/2025
|
| COMMERCIAL BUILDING PERMIT FEE |
$144,909.75
|
4/14/2025
|
| COMMERCIAL MECHANICAL FEE |
$31,931.25
|
4/14/2025
|
| COMMERCIAL NEW APPLICATION FEE |
$300.00
|
10/31/2022
|
| COMMERCIAL PLUMBING FEE |
$57,452.25
|
4/14/2025
|
| SEWER IMPACT FEE |
$0.00
|
|
| THOROUGHFARE IMPACT FEE |
$0.00
|
|
| WATER IMPACT FEE |
$0.00
|
|
| PLAN REVIEW FEE |
$100.00
|
10/29/2026
|
| PLAN REVIEW FEE |
$100.00
|
11/12/2026
|
| PLUMBING ROUGH-IN 12/02/2025 SDC |
$75.00
|
12/3/2025
|
| MECHANICAL ROUGH 10/16/2026 SDC |
$75.00
|
10/23/2026
|
| MECHANICAL ROUGH 11/06/2026 SDC |
$75.00
|
11/9/2026
|
| 3 INCH MACH 10 |
$3,725.00
|
9/17/2026
|
| 6 INCH MACH 10 |
$7,830.00
|
9/17/2026
|
| WATER METER DEPOSIT COMMERCIAL |
$2,200.00
|
9/17/2026
|
| Total Fees |
|
Charged: $274,644.75
Balance Due: $0.00
|
|
| ELECT ROUGH COMM | |
11/16/2026
| | | |
More Info
|
| DRYWALL COMM | |
11/16/2026
| | | |
More Info
|
| FRAME COMM | |
11/16/2026
| | | |
More Info
|
| PLUMB TOP OUT COMM | |
11/16/2026
| | | |
More Info
|
| MECHANICAL ROUGH | |
11/16/2026
| | | |
More Info
|
| FIREINSULATION | APPROVED |
11/13/2026
| 7:30 AM | 11/13/2026 | 8:00 AM |
More Info
|
| FIREINSULATION | APPROVED |
11/13/2026
| 7:30 AM | 11/13/2026 | 8:15 AM |
More Info
|
| MECHANICAL ROUGH | COMM FAILED |
11/13/2026
| | 11/13/2026 | |
More Info
|
| FRAME COMM | APPROVED |
11/12/2026
| | 11/12/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
11/11/2026
| | 11/11/2026 | |
More Info
|
| INSULATION COMM | APPROVED |
11/10/2026
| | 11/10/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
11/10/2026
| | 11/10/2026 | |
More Info
|
| FRAME COMM | APPROVED |
11/6/2026
| | 11/6/2026 | |
More Info
|
| MECHANICAL ROUGH | COMM FAILED |
11/6/2026
| | 11/6/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
11/5/2026
| | 11/5/2026 | |
More Info
|
| SHEATHING COMM | APPROVED |
11/5/2026
| | 11/5/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
11/4/2026
| | 11/4/2026 | |
More Info
|
| FRAME COMM | APPROVED |
11/2/2026
| | 11/2/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
10/30/2026
| | 10/30/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
10/29/2026
| | 10/29/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
10/28/2026
| | 10/28/2026 | |
More Info
|
| LATH COMM | APPROVED |
10/27/2026
| | 10/27/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
10/27/2026
| | 10/27/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
10/27/2026
| | 10/27/2026 | |
More Info
|
| FIREINSULATION | APPROVED |
10/26/2026
| 10:00 AM | 10/26/2026 | 10:30 AM |
More Info
|
| FIREINSULATION | APPROVED |
10/26/2026
| 10:00 AM | 10/26/2026 | 10:30 AM |
More Info
|
| INSULATION COMM | APPROVED |
10/21/2026
| | 10/21/2026 | |
More Info
|
| FIREINSULATION | CANCELLED |
10/20/2026
| 3:00 PM | 10/20/2026 | |
More Info
|
| FIREINSULATION | CANCELLED |
10/20/2026
| 3:00 PM | 10/20/2026 | |
More Info
|
| FRAME COMM | APPROVED |
10/20/2026
| | 10/20/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
10/20/2026
| | 10/20/2026 | |
More Info
|
| INSULATION COMM | APPROVED |
10/20/2026
| | 10/20/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
10/19/2026
| | 10/19/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
10/19/2026
| | 10/20/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
10/16/2026
| | 10/16/2026 | |
More Info
|
| CEILING | APPROVED |
10/16/2026
| | 10/16/2026 | |
More Info
|
| MECHANICAL ROUGH | COMM FAILED |
10/16/2026
| | 10/16/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
10/16/2026
| | 10/16/2026 | |
More Info
|
| MECHANICAL ROUGH | COMM FAILED |
10/16/2026
| | 10/16/2026 | |
More Info
|
| DRYWALL COMM | APPROVED |
10/15/2026
| | 10/15/2026 | |
More Info
|
| FRAME COMM | APPROVED |
10/15/2026
| | 10/15/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
10/15/2026
| | 10/15/2026 | |
More Info
|
| MECHANICAL ROUGH | COMM FAILED |
10/14/2026
| | 10/14/2026 | |
More Info
|
| MECHANICAL ROUGH | COMM FAILED |
10/14/2026
| | 10/14/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
10/13/2026
| | 10/13/2026 | |
More Info
|
| BRICKWALL TIE COMM | CANCELLED |
10/12/2026
| | 10/12/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
10/12/2026
| | 10/12/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
10/9/2026
| | 10/9/2026 | |
More Info
|
| BRICKWALL TIE COMM | CANCELLED |
10/8/2026
| | 10/8/2026 | |
More Info
|
| SHEATHING COMM | APPROVED |
10/8/2026
| | 10/8/2026 | |
More Info
|
| LATH COMM | APPROVED |
10/7/2026
| | 10/7/2026 | |
More Info
|
| DRYWALL COMM | APPROVED |
10/5/2026
| | 10/5/2026 | |
More Info
|
| DRYWALL COMM | APPROVED |
9/28/2026
| | 9/28/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
9/28/2026
| | 9/28/2026 | |
More Info
|
| FIREINSULATION | APPROVED |
9/25/2026
| 8:30 AM | 9/25/2026 | 9:30 AM |
More Info
|
| DRYWALL COMM | APPROVED |
9/23/2026
| | 9/23/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
9/23/2026
| | 9/23/2026 | |
More Info
|
| INSULATION COMM | APPROVED |
9/23/2026
| | 9/23/2026 | |
More Info
|
| INSULATION COMM | APPROVED |
9/18/2026
| | 9/18/2026 | |
More Info
|
| FIREINSULATION | APPROVED |
9/18/2026
| 10:00 AM | 9/18/2026 | 11:30 AM |
More Info
|
| DRYWALL COMM | APPROVED |
9/18/2026
| | 9/18/2026 | |
More Info
|
| SET 6IN MACH 10 METER | APPROVED |
9/18/2026
| 8:00 AM | 9/18/2026 | |
More Info
|
| SET 3IN MACH 10 | APPROVED |
9/18/2026
| 8:00 AM | 9/18/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
9/18/2026
| | 9/18/2026 | |
More Info
|
| METER PAYMENT | APPROVED |
9/17/2026
| | 9/17/2026 | |
More Info
|
| METER PAYMENT | APPROVED |
9/17/2026
| | 9/17/2026 | |
More Info
|
| INSULATION COMM | APPROVED |
9/16/2026
| | 9/16/2026 | |
More Info
|
| INSULATION COMM | APPROVED |
9/11/2026
| | 9/11/2026 | |
More Info
|
| INSULATION COMM | APPROVED |
9/10/2026
| | 9/10/2026 | |
More Info
|
| FIREINSULATION | APPROVED |
9/9/2026
| 7:30 AM | 9/9/2026 | |
More Info
|
| FIREINSULATION | APPROVED |
9/9/2026
| 7:30 AM | 9/9/2026 | 8:45 AM |
More Info
|
| INSULATION COMM | APPROVED |
9/9/2026
| | 9/9/2026 | |
More Info
|
| FIREINSULATION | APPROVED |
9/9/2026
| 7:30 AM | 9/9/2026 | |
More Info
|
| FRAME COMM | COMPLETED |
9/8/2026
| | 9/8/2026 | |
More Info
|
| INSULATION COMM | CANCELLED |
9/8/2026
| | 9/8/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
9/4/2026
| | 9/4/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
9/2/2026
| | 9/2/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
8/31/2026
| | 8/31/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
8/28/2026
| | 8/28/2026 | |
More Info
|
| FRAME COMM | APPROVED |
8/27/2026
| | 8/27/2026 | |
More Info
|
| CONSTRUCTION SAFETY | COMPLETED |
8/25/2026
| 9:30 AM | 8/25/2026 | 11:00 AM |
More Info
|
| ELECT ROUGH COMM | APPROVED |
8/24/2026
| | 8/24/2026 | |
More Info
|
| FRAME COMM | APPROVED |
8/21/2026
| | 8/21/2026 | |
More Info
|
| FRAME COMM | CANCELLED |
8/20/2026
| | 8/20/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
8/18/2026
| | 8/18/2026 | |
More Info
|
| FRAME COMM | COMPLETED |
8/17/2026
| | 8/17/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
8/12/2026
| | 8/12/2026 | |
More Info
|
| SHEATHING COMM | APPROVED |
8/7/2026
| | 8/7/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
8/5/2026
| | 8/5/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
8/5/2026
| | 8/5/2026 | |
More Info
|
| MECHANICAL ROUGH | APPROVED |
8/4/2026
| | 8/4/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
8/4/2026
| | 8/4/2026 | |
More Info
|
| SHEATHING COMM | APPROVED |
8/4/2026
| | 8/4/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
8/4/2026
| | 8/4/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
8/3/2026
| | 8/3/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
7/31/2026
| | 7/31/2026 | |
More Info
|
| PLUMB TOP OUT COMM | CANCELLED |
7/30/2026
| | 7/30/2026 | |
More Info
|
| ELECT ROUGH COMM | CANCELLED |
7/28/2026
| | 7/28/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
7/28/2026
| | 7/28/2026 | |
More Info
|
| PLUMB TOP OUT COMM | APPROVED |
7/24/2026
| | 7/24/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
7/21/2026
| | 7/21/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
7/20/2026
| | 7/20/2026 | |
More Info
|
| PLUMB TOP OUT COMM | COMM FAILED |
7/20/2026
| | 7/20/2026 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
7/17/2026
| | 7/17/2026 | |
More Info
|
| CEILING | CANCELLED |
7/16/2026
| | 7/16/2026 | |
More Info
|
| PLUMBING ROUGH-IN | COMM FAILED |
7/16/2026
| | 7/16/2026 | |
More Info
|
| PLUMB TOP OUT COMM | CANCELLED |
7/14/2026
| | 7/14/2026 | |
More Info
|
| FRAME COMM | APPROVED |
6/29/2026
| | 6/29/2026 | |
More Info
|
| SHEATHING COMM | APPROVED |
6/10/2026
| | 6/10/2026 | |
More Info
|
| CONSTRUCTION SAFETY | FIRE FAILED |
6/10/2026
| 7:30 AM | 7/31/2026 | |
More Info
|
| SHEATHING COMM | COMM FAILED |
6/2/2026
| | 6/2/2026 | |
More Info
|
| SLAB COMM | APPROVED |
5/12/2026
| | 5/12/2026 | |
More Info
|
| SHEATHING COMM | APPROVED |
5/6/2026
| | 5/6/2026 | |
More Info
|
| SLAB COMM | APPROVED |
5/5/2026
| | 5/5/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
5/4/2026
| | 5/4/2026 | |
More Info
|
| SLAB COMM | APPROVED |
5/1/2026
| | 5/1/2026 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
4/27/2026
| | 4/27/2026 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
4/17/2026
| | 4/17/2026 | |
More Info
|
| SHEATHING COMM | APPROVED |
4/15/2026
| | 4/15/2026 | |
More Info
|
| ELECT ROUGH COMM | CANCELLED |
4/10/2026
| | 4/10/2026 | |
More Info
|
| SLAB COMM | APPROVED |
4/9/2026
| | 4/9/2026 | |
More Info
|
| SLAB COMM | APPROVED |
4/6/2026
| | 4/6/2026 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
3/30/2026
| | 3/30/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
3/24/2026
| | 3/24/2026 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
3/24/2026
| | 3/24/2026 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
3/18/2026
| | 3/18/2026 | |
More Info
|
| SLAB COMM | APPROVED |
2/27/2026
| | 2/27/2026 | |
More Info
|
| SLAB COMM | APPROVED |
2/25/2026
| | 2/25/2026 | |
More Info
|
| T-POLE COMM | APPROVED |
2/20/2026
| | 2/20/2026 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
2/20/2026
| | 2/20/2026 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
2/18/2026
| | 2/18/2026 | |
More Info
|
| ELECT ROUGH COMM | COMM FAILED |
2/17/2026
| | 2/17/2026 | |
More Info
|
| SLAB COMM | APPROVED |
2/17/2026
| | 2/17/2026 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
2/12/2026
| | 2/12/2026 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
2/11/2026
| | 2/11/2026 | |
More Info
|
| SLAB COMM | APPROVED |
2/9/2026
| | 2/9/2026 | |
More Info
|
| SLAB COMM | APPROVED |
2/6/2026
| | 2/6/2026 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
2/6/2026
| | 2/6/2026 | |
More Info
|
| SLAB COMM | CANCELLED |
1/26/2026
| | 1/26/2026 | |
More Info
|
| SLAB COMM | APPROVED |
1/22/2026
| | 1/22/2026 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
1/20/2026
| | 1/20/2026 | |
More Info
|
| SLAB COMM | APPROVED |
1/16/2026
| | 1/16/2026 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
1/15/2026
| | 1/15/2026 | |
More Info
|
| SLAB COMM | APPROVED |
1/5/2026
| | 1/5/2026 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
12/30/2025
| | 12/30/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
12/18/2025
| | 12/18/2025 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
12/17/2025
| | 12/17/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
12/10/2025
| | 12/10/2025 | |
More Info
|
| PLUMBING ROUGH-IN | COMM FAILED |
12/9/2025
| | 12/9/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
12/5/2025
| | 12/5/2025 | |
More Info
|
| PLUMBING ROUGH-IN | RES FAILED |
12/4/2025
| | 12/4/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
12/3/2025
| | 12/3/2025 | |
More Info
|
| SLAB COMM | APPROVED |
12/3/2025
| | 12/3/2025 | |
More Info
|
| PLUMBING ROUGH-IN | COMM FAILED |
12/2/2025
| | 12/2/2025 | |
More Info
|
| SLAB COMM | APPROVED |
11/21/2025
| | 11/21/2025 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
11/20/2025
| | 11/20/2025 | |
More Info
|
| SLAB COMM | APPROVED |
11/19/2025
| | 11/19/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
11/18/2025
| | 11/18/2025 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
11/18/2025
| | 11/18/2025 | |
More Info
|
| FIRELANE INSPECTION | APPROVED |
11/17/2025
| 9:30 AM | 11/17/2025 | 10:45 AM |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
11/17/2025
| | 11/17/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
11/12/2025
| | 11/12/2025 | |
More Info
|
| SLAB COMM | APPROVED |
11/3/2025
| | 11/3/2025 | |
More Info
|
| SLAB COMM | APPROVED |
10/30/2025
| | 10/30/2025 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
10/29/2025
| | 10/29/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
10/28/2025
| | 10/28/2025 | |
More Info
|
| SLAB COMM | APPROVED |
10/24/2025
| | 10/24/2025 | |
More Info
|
| SLAB COMM | APPROVED |
10/22/2025
| | 10/22/2025 | |
More Info
|
| FOOTINGS COMM | APPROVED |
10/17/2025
| | 10/17/2025 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
10/16/2025
| | 10/16/2025 | |
More Info
|
| FOOTINGS COMM | APPROVED |
10/15/2025
| | 10/15/2025 | |
More Info
|
| SLAB COMM | APPROVED |
10/15/2025
| | 10/15/2025 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
10/13/2025
| | 10/13/2025 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
10/13/2025
| | 10/13/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
10/8/2025
| | 10/8/2025 | |
More Info
|
| FOOTINGS COMM | APPROVED |
10/6/2025
| | 10/6/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
10/6/2025
| | 10/6/2025 | |
More Info
|
| ELECT ROUGH COMM | APPROVED |
10/3/2025
| | 10/3/2025 | |
More Info
|
| UNDERGROUND ELEC | APPROVED |
9/30/2025
| | 9/30/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
9/29/2025
| | 9/29/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
9/25/2025
| | 9/25/2025 | |
More Info
|
| PLUMBING ROUGH-IN | CANCELLED |
9/22/2025
| | 9/22/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
9/19/2025
| | 9/19/2025 | |
More Info
|
| PLUMBING ROUGH-IN | APPROVED |
9/18/2025
| | 9/18/2025 | |
More Info
|
| BRICKWALL TIE COMM | CANCELLED |
9/12/2025
| | 9/12/2025 | |
More Info
|
| PIER COMM | APPROVED |
8/14/2025
| | 8/14/2025 | |
More Info
|
There are currently no reviews on this record.