Notes:
*MODEL* 3713 AC, 4607 SF, SFR / 2 STORY
9/29/2016 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (06/18/13) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
004. DRIVEWAY SLOPE MUST NOT EXCEED 12%; PLOT PLANS WITH SPOT GRADES ARE REQUIRED.
005. RETAINING WALLS THREE (3) FT OR TALLER MUST BE OF ENGINEERED DESIGN.
014. BEAMS=10"W X 28"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
027. WINDOW BOX-OUTS WITH SIDING & TRIM MUST NOT EXCEED TWICE THE WINDOW M.O. AREA.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
048. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
(9/29/2016 1:41 PM JC)
Study must not be used as a sleeping room when the optional door to garage 2 is installed.