Notes:
4368 AC, 5340 SF, SFR / 2 STORY
6/30/2016 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (06/18/13) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
015. BEAMS=10"W X 29"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
032. ALL SIDING, TRIM, SHAKES AND SIMILAR NON-MASONRY EXTERIOR SURFACE COVERINGS MUST BE OF CEMENTITIOUS MATERIAL; (OR) ENGINEERED/TREATED WOOD PRODUCT.
037. ATTIC STORAGE MUST NOT BE CONVERTED TO HABITABLE LIVING AREA WITHOUT A BUILDING PERMIT
043. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
045. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
**** 2ND STORY - GR, US, 4BR, & 2BA ****