Notes:
CALT / FOUNDATION REPAIR JC PENNY LOAD DOCK
5/18/2011 12:00:00 AM
FOUNDATION REMEDIATION FOR SCREENING WALL LOCATIONS AS SPECIFIED ON SITE PLAN AND REFERENCE APPROVED PLANS.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR FOOTING AND BUILDING FINAL INSPECTION REQUIRED.
LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
(8/24/2011 7:45 AM VI)
TODAY WE RECEIVED A COMPLETION LETTER WITH A SEAL AND SIGNITURE FROM KENT D. SCHLAGER, P.E. INDICATING THIS PROJECT WAS COMPLETED AS PLANNED ON MAY 16, 2011