Notes:
825 SQ FT, CIFO / LOCKE MORTGAGE
11/16/2007 12:00:00 AM
1. FULLY SPRINKLED, II-B CONSTRUCTION
2. TEMPERED WINDOW/GLASS WHERE APPLICABLE.
3. INTERIOR FINISHES: GROUP B, CLASS B
FLAME SPREAD 26-75 SMOKE DEV. 0-450
4. SUBJECT TO FIRE MARSHAL AND CITY APPROVED INSPECTIONS AND TESTING.
5. FIRE/SMOKE DAMPERS REQ'D. WERE DUCT PENETRATES THRU DEMISING WALL.
Mechanical ordinance 06-11-113
1. All duct work to be sealed with mastic, welds, or gaskets; Tapes not accepted.
2. All exhaust fans to terminate outside of the bldg.
3. Fresh air intakes to be 10 ft. away or 2 ft. below exhaust gas openings & require dampers to close intake when not in use.
4. Mech. Contractor to be responsible for duct sizing and load calculation.
5. Mech. Contractor to verify fresh air intake per IMC 403 & table 403.3
6. Mech. Installation to comply with 2003 IECC and supplements.
7. Rigid duct required with 6 ft. (R-6) flex duct connector allowed between rigid duct and diffuser.
8. Set back T-Stats required for each zone.
9. Smoke detectors/dampers to be installed per chapter 6 of IMC.
10. Subject to field review and inspection
11. FIRE/SMOKE DAMPERS WHERE PENETRATING 1 HR. CORRIDORS WHERE THESE DUCTS COMMUNICATE WITH OTHER OPENINGS IN THAT SAME CORRIDOR.
12. Any mechanical equipment mounted on roof shall comply with the screening ordinance Article 4 section 11.09 (D). Line of sight 6' above grade at property line.