Notes:
1. subject to fire marshal, field approved inspections and testing.
2. 2 hr. fire/smoke connection @ mullion.
3. fully sprinkled.
4. any wood used shall be fire treated.
5. interior finishes: Table 803 IBC 2003 parts D, E.
6. mandatory occupant load signage req'd. IBC 1004.3
7. showers must comply with TAS & ADA, TAS section 4.21 & 4.26.
8. clarify location of fire riser room & roof access.
9. tempered glass where req'd.
10. existing demising wall shall be 2 hr. fire/smoke construction, fire caulk floor to deck. (adjacent tenant space is Irish Rover restaurant).
11. existing corridor is a exiting corridor and shall be 1 hr. fire/smoke construction with any thru wall penetrations fire/smoke damper proof.
4054 SQ FT, CIFO / SUNSTONE YOGA