Notes:
2565 SQ FT, CIFO / DOUBLE DAVE'S PIZZA
3/21/2006 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” or 6" metal studs w/ 5/8” type X gypsum on both sides up to deck, fire caulk floor to deck.
3. IMC 2003 508.1 make up air unit shall be electrically interlocked to insure that makeup air is provided whenever the exhust system is in operation,
w/ 1 hr. shaft enclosure or equivalent fire wrap.
4. fully sprinkled.
5. all construction subject to field app'd. inspection.