Notes:
1- CONTINGENT UPON COMPLIANCE WITH BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2- BECAUSE OF THE USE AS A SEAT-IN DRINKING FACILITY, THIS COFFEE SHOP NEEDS MORE PARKING SPACES THAN WHAT ORIGINALLY PROVIDED UNDER THE BLDG'S RETAIL RATIO, THEREFORE A P+Z'S WRITTEN CLEARANCE, WAIVER, OR OTHER ARRANGED SOLUTION, IS TO BE SUBMITTED AS REQ'D.(per scott ingalls-parking situation is ok)
3- VERIFY WITH THE ENVIRONM'L SVCS DEPT. (972-335-5519) FOR ADDITIONAL NEEDS OR ADEQUACY OF EXISTING TRASH FACILITY PRIOR STARTING ANY CONSTRUCTION.
4- NEW WINDOW OPNG THRU THE EXISTING TILT-UP CONC. PNL IS PERMITTED ONLY UPON SUBMITTAL AND APPROVAL OF SEALED STRUCT'L ENGR'S DTLS WITH SPECIFIC INFO. IF THE CUT-OUT NEEDS ADDITIONAL PNL REINFORCING OR NOT. ARCHIT'L JAMB, HEAD & SILL DTLS SHOULD ALSO BE SUBMITTED.
5- UNLESS ALREADY EXISTING, PROVIDE FURR-OUT FINISH ON THE INTERIOR SIDE OF ALL EXTERIOR WALLS FILLED WITH MIN. R-11 BLDG INSULATION AS REQ'D.
6- ENDING OF DEMISING WALL AGAINST STOREFRONT'S GLASS IS NOT PERMITTED. END OF WALL TO BE JAGGED AS NECESSARY FOR A VALID 1 HR FIRE/SMOKE CONNECTION TO STOREFRONT'S MULLION AS REQ'D. (SUBMIT DETAILS FOR APPROVAL).
7- PENDING SUBMITTAL & APPROVAL OF COFFEE ROASTER MANUFACTURER'S CUT-SHEET INFO. AND RELATED SYSTEM DETAILS INCLUSIVE OF FIRE RATING INFO. FOR EXH. FLUE ASSEMBLY, TOUCH SHIELDING PROTECTION, ETC. PROVIDE OUTSIDE AIR INTAKE FOR GAS COMBUSTION UNLESS NOT RECOMMENDED BY THE MANUF. CHIMNEY ABOVE ROOF TO BE SET BACK FROM PARAPET A MIN. OF 10' OR AS MUCH AS NECESSARY TO AVOID PUBLIC VISIBILITY. (ENTIRE EQUIPMENT MUST ALSO BE ACCEPTABLE TO HEALTH DEPT.).
8- COFFEE ROASTER EQUIPMENT TO BE SEPARATED FROM PUBLIC AREA AS REQ'D.
9- SUBJECT TO ADDITIONAL REQUIREMENTS FROM M.E.P. REVIEWS, FIRE MARSHAL, HEALTH & FOOD SAFETY DEPT. AND FIELD INSPECTIONS.
1800 SQ FT, CIFO / DUNN BROS. COFFEE