Notes:
3400 SQ FT, CIFO / SHAPE XPRESS
8/6/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 6” metal studs w/ 5/8” type X gypsum on both sides up to deck.
3. 20 minute interior doors
4. 45 minute door.
5. one hour corridor which includes one hour demising wall and one hour wall w 6" metal stud interior wll w 5/8" gypsum on both sides upto deck, fire caulk
6. one additional exit required (exit only)
7. fully sprinklered
8. tempered windows 2' of windows
*** CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
LICENSED SUBCONTRACTORS MUST BE REGISTERED WITH THE CITY OF FRISCO BEFORE BEGINNING ANY WORK. SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
REFER TO APPROVED PLANS FOR NOTES.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.