Notes:
1- CONTINGENT UPON COMPLIANCE WITH CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2- EXIT PATHWAY OF CORRIDOR 489 TO BE PREPARED FOR PRONT INSTALLATION OF TWO-WAY FIRE DOORS ASSEMBLY THRU 2 HR FIRE SEPARATION WALL SYSTEM WITH FUTURE ADJOINING BLDG F1-8 WHEN CONSTRUCTED. MEANWHILE, DEAD-END EXITING CONDITION @ THIS POINT MUST BE AVOIDED BY PROVIDING 1 HR TWO-WAY DOORS ASSEMBLY WITH CORRIDOR 436 AS REQ'D.
3- OMIT STORAGE 432D IN ORDER TO PROVIDE A SECONDARY EMERGENCY EXITWAY FROM THE RECEPTION AREA AS REQ'D.
4- SUBJECT TO ADDITIONAL REQUIREMENTS FROM M.E.P. REVIEWERS, FIRE MARSHAL AND FIELD INSPECTIONS.
14486 SQ FT, CIFO / COMPLETE EXECUTIVE OFFICES