Notes:
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(1/30/2004 10:33 SOM)SECOND FLOOR WITH BEDROOM #2,3,4, LOFT, 1 BATH AND GAMEROOM
NEED GAS AND ELECTRIC PROVIDERS- FUTURE
? (HOW MANY) #6'S IN ALL BEAM BOTTOMS
3511 AC, 4379 SQ FT, SFR \ 2 STORY