Notes:
6130 AC, 7622 SQ FT, SFR / 2 STORY
11/11/2003 12:00:00 AM
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
56. LETTERS OF ACCEPTANCE REQUIRED FROM BOTH ENGINEERS FOR CO.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
(11/11/2003 10:04 MBW)GRADE BEAMS-(2)#5 REBAR IN ALL BEAM BOTTOMS.
PIERS-12"0 WITH (5)#5 VERTICAL REBAR-36"0 BELLED BOTTOMS, 17 FT DEEP.
"EIFS" NOT ALLOWED FOR RESIDENTIAL.