Notes:
1- CONTINGENT UPON COMPLIANCE WITH P+Z/CC, CITY ENGG & FIRE DEPT. APPROVALS OF FINAL SITE PLAN (INCLUDING PARKING PROVISIONS) , TDLR APPROVALS, CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS, AND ALL REVIEW COMMENTS.
2- PROVISION, LAYOUT AND OPERATION OF SERVICE COURT FACILITIES (INCLUDING FIRE DEPT'S ACCESS & TURN-AROUND, LOADING DOCKS, WASTE AND OTHER UTILITY AREAS) REQUIRE SPECIFIC WRITTEN APPROVALS FROM THE FIRE MARSHAL AND THE ENVIRONMENTAL SVCS DEPT. PRIOR ANY CONSTRUCTION.
3- PROVIDE 3 HR OCCUPANCY SEPARATION BETWEEN HOTEL BLDG, CONVENTION BLDG AND PARKING STRUCTURE AS PER COMMENTS.
4- PROVIDE 2 HR SEPARATION ENCLOSURE OF KITCHEN AREA AS REQ'D.
5- ADD UNISEX TOILET AT ATRIUM FLOOR ASSEMBLY AREA AS REQ'D.
6- ATRIUM SPACE MUST BE ENTIRELY 1 HR MIN. SEPARATED AT ALL LEVELS (INCLUDING MECH'L SPACES AT TOP PENTHOUSE LEVEL).
7- ACCESSES TO PENTHOUSE LEVEL TO BE 1 HR SEPARATED ENCLOSURES.
8- TOWER'S ROOF STRUCTURE TO BE MIN. 1 HR RATED CONSTRUCTION AND DESIGNED TO SUPPORT & WITHSTAND ALL TRANSFERED LOADS FROM THE ATRIUM'S SKYLIGHT.
9- SKYLIGHT DESIGN TO CONFORM TO IBC, IECC & STRUCTURALLY ENGINEERED TO COMBINE WITH THE BLDG STRUCTURE AS REQ'D.
10- SUBJECT TO M.E.P. REVIEWS, HEALTH DEPT, ENVIRONMENTAL SVCS, FIRE MARSHAL AND ALL CONSTRUCTION INSPECTIONS.
309788 SQFT CNEW / EMBASSY SUITES HOTEL(HOTEL PHASE)